La susmp manual






















A Manual for the Standard Urban Stormwater Mitigation Plan (SUSMP), Los Angeles County Department of Public Works, May Model Standard Urban Storm Water Mitigation Plan (SUSMP) for San Diego County, Port of San Diego, and Cities in San Diego County, Febru. Based on LA SUSMP requirement and CASQA BMP Manual Requires local historical rainfall records Environment Federation’s Manual of Practice;14 or, The volume of annual runoff required to achieve 80% or more treatment, determined in accordance with the methodology set. IMPORTANT NOTICE J The Low Impact Development Counter will continue to support all development service functions through the LID Plan Check Portal and to operate the "Drop-off/Pick-up" system, by way of the City of Los Angeles Continuity of Operations Plan for Development Services Centers, until a reopening date is announced for in-person services at all City of Los Angeles.


In dealing with the SUSMP, we have a depressed loading dock catch basin. Most of the loading dock is under a roof, but approximately SF of the loading dock is not covered and stormwater drains into the loading dock catch basin. This catch basin drains through a 4 PVC pipe to an oil/water separator inside the building. From the oil/water separator, the storm water from the loading dock is. Appendix J County of LA Department of Public Health Policy and Operations Manual LIST OF TABLES Table Summary of Source Control Measure Design Features In , the City of Los Angeles implemented the SUSMP program requiring all the affected land development projects to capture or treat stormwater runoff. Mitigation Plan (SUSMP) or the Low Impact Development (LID) ordinance are required by the Department of Public Works, Bureau of Sanitation to infiltrate storm water runoff when in compliance with Los Angeles Building Code (LABC) Sections and DEFINITIONS.


) from the new development, use the Los Angeles County Department of Public Works Hydrology Manual. Use the Modified Rational Method for calculating the peak mitigation Q PM for compliance with the Standard Urban Stormwater Mitigation Plan (SUSMP). Use attached Table 1 for all maximum intensity (I X) values used. Urban Stormwater Mitigation Plan (SUSMP) document. To assist in the preparation of the SUSMP document, Los Angeles County Department of Public Works has developed a manual entitled “Low Impact Development Standards Manual dated February This manual provides guidance for compliance with the SUSMP requirements. This manual also. Los Angeles World Airports Low Impact Development (LID) Standard Urban Stormwater Mitigation Plan (SUSMP) These are two independent requirements. There is overlap, so either, both or neither may be applicable to a given project. A. The Contractor shall comply with Low Impact Development Ordinance No. ,, adopted by the Los Angeles City Council.

0コメント

  • 1000 / 1000